
|

|

|
Engineering Department
The engineering division is mainly responsible for transportation and utility related issues. This includes all design and inspection of municipal infrastructure improvements such as roadways, sanitary sewer, and storm sewer. This division, by directing Street and Sewer personnel, is responsible for snowplowing, patching asphalt, sewer backups, and the maintenance of sanitary and storm sewers.
College Drive Reconstruction
2012 Construction Projects
College Drive
North Brainerd Reconstruction
- Front Street Reconstruction
- N 10th St between Washington St and Grove St Reconstruction
- N 7th St between Washington St and Kingwood St Reconstruction
NE/SE Brainerd Reconstruction
- 12th Ave NE between L St and O St Resurfacing
- 9th Ave NE between F St and H St Reconstruction
- Quince St between SE 12th St and SE 13th St Reconstruction
- Quince St between SE 11th St and SE 12th St Resurfacing
- SE 15th St and SE 16th St between Oak St and Norwood St Resurfacing
- 8th Ave between L St and N St Reconstruction
- North-South Alley in Block 24 West Brainerd Construction
2012 Seal Coat Project
Applications
Information Sheets
|

|
|
|